Platform Solutions: Factories Solutions: Process Industry Solutions: EU Compliance Pricing Blog About Sign In Request Pilot
Industrial Energy Optimization

Stop paying for energy
your plant wastes.

GridPulsr monitors furnace, compressor and HVAC load curves at 1-second resolution — identifying the 15-minute demand peaks that inflate EU capacity charges, and the thermal leaks that waste gas between shifts.

kW 800 600 400 200 00:00 06:00 10:00 14:00 18:00 22:00 DEMAND PEAK Compressor bank Furnace load LIVE
5–12%
Capacity charge inflation

A single overlooked furnace startup during a 15-minute demand window can add 5–12% to your monthly EU capacity charge.

8–15%
Gas wasted from thermal leaks

Uninsulated steam traps and furnace door cycles waste 8–15% of gas consumption between production runs.

10–30%
Compressed air electricity share

Compressed air accounts for 10–30% of industrial electricity use, with undetected pressure decay from fitting leaks costing thousands per year.

Deployment

From sensor to insight in 48 hours

No professional services engagement. No 6-month onboarding. A plant engineer can deploy GridPulsr and see real load curve data the same week.

Step 01

Connect the gateway

Attach the GridPulsr sensor gateway to your existing infrastructure via Modbus RTU/TCP, MQTT, OPC-UA or pulse meters. No rewiring required.

Step 02

Data streams to platform

1-second resolution load curves arrive at the GridPulsr platform. Thermal profiles and air pressure data are normalised across your asset inventory.

Step 03

Daily optimization reports

GridPulsr identifies demand peak windows, thermal leak sources and compressed air decay. Daily reports include quantified kWh savings estimates and payback timelines.

GridPulsr platform dashboard showing energy load curves with demand peak annotations
Real-time thermal monitoring

Every energy load on your plant floor, live.

One dashboard shows furnace cycle efficiency, compressed air pressure trends, and HVAC runtime against shift schedules. Demand peak annotations let you see exactly which asset triggered a capacity charge event.

Explore the Platform
What plant engineers say

Results from the plant floor

GridPulsr has been deployed in 30+ EU manufacturing facilities since 2022. Pilot deployments run 30 days; most customers convert within the first month.

We had a Modbus network on the furnace for years but the data went nowhere useful. GridPulsr pulled it into a load curve we could actually read. The first thing we found was a reheating cycle firing during the lunch break shutdown — running for 45 minutes with no product in the furnace. That one change covered the first three months of monitoring cost.

Capacity charges reduced 11% in first quarter after pilot
Volmark Steel
Energy Manager, steel fabrication facility, Sweden

We run three screw compressors feeding a ring main for 40 CNC machines. Pressure had been drifting down over two years and we kept adding compressor running time to compensate. GridPulsr's overnight decay signatures showed a 1.1 bar drop across 6 hours — we found four fittings and two push-connect joints that had degraded. Fixing them dropped compressor duty cycle by 18%.

Identified compressed air waste equivalent to 14,200 kWh/month
Arktis Precision Components
Plant Engineer, precision machining facility, Finland

Previous ISO 50001 audits meant three weeks of pulling manual meter logs, cross-checking shift records, and explaining gaps in the measurement plan. With GridPulsr running for six months before the audit, the measurement evidence was already structured and exportable. The auditor had no data continuity questions. We just printed the reports.

ISO 50001 audit preparation time reduced from 3 weeks to 4 days
Nordvik Plastics
Operations Director, injection molding facility, Norway
EU ETS & ISO 50001

Built for EU energy reporting requirements.

EU ETS Phase 4 obligations through 2030, expanded CBAM scope covering steel and cement, and ISO 50001 recertification cycles all require the same input: continuous, verifiable, plant-level energy consumption data. GridPulsr produces that data as a byproduct of normal monitoring — not as a separate compliance project.

EU ETS Plant-level energy intensity data with 1-second sampling resolution, exportable per reporting period.
ISO 50001 Continuous measurement plan evidence: energy baseline data, deviation alerts, and structured improvement reports.
CBAM Carbon content per production tonne derived from metered energy consumption, not estimates.
View EU Compliance Details
EU ETS
Emissions trading system data exports
ISO 50001
Measurement plan evidence
CBAM
Carbon content per tonne reporting
GDPR-compliant
EU data residency & processing

Start your 30-day pilot.

No procurement process. No professional services contract. Your controls engineer connects the gateway via Modbus or OPC-UA; you have live load curve data within 48 hours. The pilot assessment report identifies specific savings opportunities with kWh estimates and payback timelines — whether you continue with GridPulsr or not.