Audit-ready energy data for EU reporting.
EU ETS Phase 4 obligations run through 2030 with tightening annual reduction targets. CBAM scope expanded to cover steel, aluminium, cement, fertilisers, and electricity in 2026. ISO 50001 recertification requires continuous measurement evidence, not annual snapshots. GridPulsr produces the underlying metered plant-level data that each of these frameworks requires — at the asset level, with the 1-second resolution that verifiers accept as primary evidence.
What each framework requires — and what GridPulsr provides.
GridPulsr produces continuous metered energy data. Regulatory filing, third-party verification, and compliance submissions remain the plant operator's responsibility. GridPulsr does not provide legal, environmental, or compliance advisory services.
EU Emissions Trading System
EU ETS Phase 4 (2021–2030) requires manufacturing installations above threshold to report verified plant-level energy intensity and CO₂ emissions per production unit. Metered electricity and fuel consumption data is the evidentiary basis.
ISO 50001:2018 Energy Management Systems
ISO 50001 certification requires documented energy baselines, a measurement plan with defined meters and sampling intervals, deviation alerts, and evidence of continual improvement actions. GridPulsr provides the continuous measurement infrastructure underlying the measurement plan.
Carbon Border Adjustment Mechanism
CBAM requires importers of goods from sectors including steel, cement, and aluminium to report the embedded carbon content per tonne. For EU manufacturers in scope, this means demonstrating metered energy consumption per production unit to compute carbon intensity.
Start building the measurement baseline your compliance team needs.
A 30-day pilot generates plant-level energy intensity data structured around EU ETS and ISO 50001 evidence requirements. Your compliance team gets the data; GridPulsr does not file on your behalf. No procurement process, no professional services engagement — just your controls engineer, our gateway, and 48 hours to first data.